Elisen had the responsibility to produce all structural analysis, test reports and maintenance data to support certification of the CRJ700 Empennage.

Work Package definition:

  • Vertical Stabilizer main structure
  • Leading Edge
  • Horizontal Stabilizer interface
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.